Cottage, 8/29/12
|
Merrill House (Large Residence), 8/29/12
|
Bedroom, 8/29/12
|
Dining room at Merrill House (large residence), 8/29/12
|
Kitchen in residence, 8/29/12
|
School entrance and pergola, 8/29/12
|
School courtyard, 8/29/12
|
Classroom, 8/29/12
|
Art classroom, 8/29/12
|
School cafeteria, 8/29/12
|
New entrance 7/17/12
|
School classroom 7/17/12
|
School classroom 7/17/12
|
School hallway 7/17/12
|
School bathroom 7/17/12
|
Ductwork in School 5/15/12
|
School ceiling and lights 5/15/12
|
Millwork in School 5/15/12
|
School exterior 5/15/12
|
School building 5/15/12
|
Propane tanks 5/15/12
|
School siding 5/8/12
|
Small Residence interior 5/8/12
|
Small Residence interior 5/8/12
|
Site paving 5/2/12
|
Cottage millwork 5/2/12
|
School addition 4/17/11
|
School interior 4/17/12
|
School facade, 4/17/12
|
Small Residence flooring 4/17/12
|
Small Residence flooring 4/17/12
|
School addition facade 4/3/12
|
New school hallway 4/3/12
|
School addition facade 4/3/12
|
Roof insulation at School addition 4/3/12
|
Kitchen cabinets being installed at residence 4/3/12
|
Ceilings installed at residence 3/27/12
|
School exterior 3/13/12
|
School exterior 3/13/12
|
School framing 3/13/12
|
Stairs at School 3/13/12
|
Dining room at Large Residence 3/13/12
|
Spray fireproofing 3/13/12
|
Residence light fixtures 3/6/12
|
School addition 2/28/12
|
Cottage framing 1/24/12
|
Cottage trim and siding 1/24/12
|
Small Residence sheetrock 1/17/12
|
Large Residence insulation 1/24/12
|
Fire protection tank 1/17/12
|
School addition 1/24/12
|
School addition 1/24/12
|
Steel framing for School addition 1/10/12
|
Steel framing for School addition 1/10/12
|
Steel framing for School addition 1/10/12
|
Windows at cottage B 1/10/12
|
Preparation for slab at cottage A 1/10/12
|
Large Residence window trim 12/13/11
|
Large Residence roof 12/13/11
|
Large Residence framing 12/13/11
|
School foundation 12/13/11
|
Cottage framing 12/13/11
|
Cottage ledge removal 12/13/11
|
Large Residence Interior 11/29/11
|
Large Residence 11/22/11
|
Large Residence 11/22/11
|
Cottage slab, 11/22/11
|
School foundation 11/22/11
|
School foundation 11/22/11
|
Large Residence framing 11/1/11
|
Large Residence framing 11/1/11
|
Cottage foundations, 11/1/11
|
Cottage ledge 11/1/11
|
Cottage foundations 11/8/11
|
Footing Preparation at Cottages 10/18/11
|
Backfill at Large Residence 10/18/11
|
Electrical feeds to Large Residence 10/18/11
|
Footings at School 10/18/11
|
Slab placement at Small Residence 10/18/11
|
Preparation for School Addition 10/11/11
|
Small Residence Foundations 10/11/11
|
Former White House Location 10/11/11
|
Landscape Buffer 10/11/11
|
Small Residence Foundations and Walls 10/7/11
|
Drainage Structures 10/7/11
|
Large Residence Footings 10/7/11
|
Large Residence Foundations and Walls 10/7/11
|
Preparation for School Addition Foundation 10/7/11
|
Foundations at Large Residence 9/20/11
|
Foundations at Large Residence 9/20/11
|
Footings at Small Residence 9/20/11
|
Fill at Large Residence 9/13/2011
|
Rebar for Foundation at Small Residence 9/13/11
|
Road 9/13/11
|
Beginning to Install Roads 8/23/11
|
Removing Topsoil 8/23/11
|
Removing Topsoil 8/23/11
|
Tree Removal 8/9/11
|
Removing Topsoil 8/16/11
|
Removing Topsoil 8/17/11
|
Removing Topsoil 8/17/11
|
|